top of page

The proposed expansion of the Passenger Terminal of the Santos Dumont Airport is necessarily due to the observance of several extraordinary factors, besides those usually considered in this type of project. In view of this, the party adopted for the enlargement of the Terminal of Passengers of the Santos Dumont Airport considered a minimum of physical interventions in the existing building, seeking only to adapt it to the new proposed operational configuration. The new building is a glazed central body with the functions of lobby and landing

client

Infraero;

Figueiredo Ferraz

 

land area

32.058 

 

built area

185.690 

 

existing building

7.700 m²

 

airport expansion

47.300 m²

 

hotel/business center

130.690 m²

 

partnership

Planarcon Projetos
Técnicos Ltda.

 

location

and landing area on the first floor, landing and boarding and landing remote on the ground floor. This central link "leans" in the current building with a subtle intervention, in respect to the architectural features of the building. In the original proposal, it was planned the deployment of areas for offices, shops, hotel and covered parking in the space now occupied by the airport's uncovered parking. It should be noted that the proposed shading solution for the shipping area (brise-soleil) was not installed.

bottom of page